Pump unit,centrifug, in repair/modification of

Solicitation (Request for proposal) from Navsup Weapon Systems Support Mech. Responses are due Nov 27, 2026 (7 days left).

Open to all (no set-aside)Any registered business can bid, large or small.Who qualifies
  • 7Days left to respond
  • 47 daysThis buyer usually gives
  • 56%Notices this buyer changes
  • $789KTypical award from this office

What BidCamel found about this buyer

  • This office usually gives bidders 47 days to respond; this notice gives 176 days.
  • It changed 56% of its 942 notices after posting, so check for amendments before you submit.
  • It has 496 open bids right now. See them all.
  • It has made 34 awards in our records, typically $789K.

Companies this office paid before

  • Martin-Baker Aircraft Company Limited: 5 awards, $24.2M total
  • Nammo Defense Systems Inc.: 3 awards, $7.0M total
  • Rockwell Collins, Inc.: 2 awards, $7.4M total
  • Eaglepicher Technologies Llc: 2 awards, $5.5M total
  • Applied Energy Technology Corp: 2 awards, $1.2M total

These are past winners at this office, not the winner of this exact contract.

Key details
Solicitation number
N0010426RTB38
NAICS code
333914 Measuring, Dispensing, and Other Pumping
Size standard for this code
750 employees
Set-aside
Open to all (no set-aside)
Buying
Product
Place
Mechanicsburg, PA · Pennsylvania bids
Posted
Jun 4, 2026
Last changed
Oct 28, 2026 (8 versions)
Contact
Contact details are on the SAM.gov notice. Open on SAM.gov

Description

ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| STOP-WORK ORDER (AUG 1989)|1|| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|COMBO INVOICE AND RECEIVING||TBD|N00104|TBD|TBD|SEE SCHEDULE|SEE SCHEDULE|SEE SCHEDULE||TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS MECHANICSBURG| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|| VALUE ENGINEERING (JUN 2020)|3|||| INTEGRITY OF UNIT PRICES (NOV 2021)|1|| EQUAL OPPORTUNITY FOR VETERANS (DEV 2026-O0040)(FEB 2026)|4||||| SMALL BUSINESS SUBCONTRACTING PLAN (DEV 2026-O0037)(FEB 2026)|4||||| SAFEGUARDING SENSITIVE CONVENTIONAL ARMS, AMMUNITION, AND EXPLOSIVES (NOV 2023))|9|||||||||| EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026)|4||||| TRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2||| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)-BASIC (DEV 2026-O0037)(JUL 2026))|2||| CONTRACTOR PURCHASING SYSTEM ADMINISTRATION-BASIC (DEV 2026-O0015)(JUL 2026)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| LIST OF AWARD ATTACHMENTS|5|||||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|X|X|X|||X|X||||||| TYPE OF CONTRACT (DEV 2026-O0045)(MAR 2026)|1|FIRM FIXED PRICE| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| ONLY ONE OFFER (DEVIATION 2026-O0048)(MAR 2026)|1|| Amendment to update clauses and extend solicitation. Amendment to extend solicitation and update clauses. See continuation pages for details. Amendment to update clauses and extend solicitation. The complete RFP package must be signed and returned prior to the closing date. Emailed proposals are acceptable. NECO quotes will NOT be accepted and will be determined non-responsive. 1. SCOPE 1.1 This contract/purchase order contains the requirements for repair and the contract quality requirements for the PUMP UNIT,CENTRIFUG . 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS 3.1 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the NAVICP-MECH Contracting Officer has notified and approval has been given by issuance of a written change order. When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the substituting/replacement item, a drawing and an explanation of the reason for the change, explaining the reason therefor. If finished detail drawings are not available, shop drawings in the form used by the manufacturer will be acceptable for Government evaluation. When notifying the Procurement Contracting Officer of the reasons for making substitutions, the type of change shall be indicated by code number in accordance with one of the following statements: Code 1: PART NUMBER CHANGE ONLY - If the Manufacturer's Part Number indicated thereon has changed, but the parts are identical in all respects, supply the item and advise NAVICP-MECH immediately of the new part number. Code 2: Assembly (or set or kit) not furnished - Used following detail parts. Code 3: Part not furnished separately - Use assembly. Code 4: Part redesigned - Old and new parts are completely interchangeable. Code 5: Part redesigned - New part replaces old. Old part cannot replace new. Code 6: Part redesigned - Parts not interchangeable. 3.2 Cage Code/Reference Number Items - The PUMP UNIT,CENTRIFUG repaired under this contract/purchase order shall meet the operational and functional requirements as represented by the Cage Code(s) and reference number(s) listed below. All repair work shall be performed in accordance with the contractors repair/overhaul standard practices, manuals and directives including but not limited to drawings, technical orders, manufacturing operations, tooling instructions, approved repair standards and any other contractor or government approved documents developed to provide technical repair procedures. CAGE___Ref. No. ;0EXU3 699D7672; 4. QUALITY ASSURANCE 4.1 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order. The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program. The absence of any inspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order. Sampling in quality conformance does not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material. 4.2 Records - Records of all inspection work by the Contractor shall be kept complete and available to the Government during the performance of contract/purchase order and for a period of 365 calendar days after final delivery of supplies. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE

Read the full notice and attachments on SAM.gov

Similar open bids

All open bids for NAICS 333914

From SAM.gov and USAspending.gov public data. BidCamel adds the buyer and award facts.

Save and get alerts